Last Modified: 11-29-2007 1.6 A
Service Category: Engine/Hybrid System Section: Engine Mechanical
Model Year: 2008 Model: Sequoia Doc ID: RM000002WGD007X
Title: 2UZ-FE ENGINE MECHANICAL: CAMSHAFT: INSTALLATION (2008 Sequoia)

INSTALLATION

1. INSTALL CAMSHAFT SETTING OIL SEAL



(a) Apply MP grease to the lip of a new oil seal.

NOTICE:

  • Do not allow foreign matter to contact the lip of the oil seal.
  • Do not allow MP grease to contact the dust seal.

(b) Insert 2 new oil seals into the camshaft timing tube until they reach the stopper.

NOTICE:

  • Be careful of the installation direction.
  • Do not turn over the lip of the oil seal.

2. INSTALL CAMSHAFT TIMING TUBE ASSEMBLY



(a) Align the timing tube knock pin with the knock pin groove of the drive gear, and temporarily install the drive gear with the 4 bolts.

(b) Using SST and a 5 mm hexagon wrench, uniformly tighten the 4 bolts in several steps.

SST: 09960-10010

09962-01000

09963-00500

Torque: 7.5 N·m (76 kgf·cm, 66 in·lbf)

NOTICE:

Be careful not to damage the timing tube.


(c) Mount the hexagonal portion of the camshaft in a vise.

NOTICE:

Be careful not to damage the camshaft.


(d) Align the camshaft knock pin with the knock pin groove of the timing tube, and push the timing tube by hand until it touches the bottom.

NOTICE:

Do not forcefully push on the camshaft timing tube. This may cause the camshaft knock pin tip to damage the installation surface of the camshaft timing tube.

(e) Using a 10 mm hexagon wrench, install the bolt.

Torque: 78 N·m (795 kgf·cm, 58 ft·lbf)

(f) Install the seal washer and screw plug.

Torque: 15 N·m (153 kgf·cm, 11 ft·lbf)

3. INSTALL NO. 3 CAMSHAFT SUB GEAR




(a) Install the gear spring, sub-gear and wave washer.

HINT:

Attach the pins on the gears to the gear spring ends.

(b) Using snap ring pliers, install the snap ring.


(c) Mount the hexagonal portion of the camshaft in a vise.

NOTICE:

Be careful not to damage the camshaft.


(d) Using SST, align the holes of the driven gear and sub-gear by turning the sub-gear clockwise, and temporarily install a service bolt.

Recommended Service Bolt:

Thread Diameter

Thread Pitch

Bolt Length

6 mm

1.0 mm

16 to 20 mm (0.630 to 0.787 in.)

(e) Align the gear teeth of the driven gear and sub-gear, and tighten the service bolt.

4. INSTALL CAMSHAFT SUB-ASSEMBLY (for Bank 1)

NOTICE:

As the thrust clearance of the camshaft is small, the camshaft must be kept level while it is being installed. If the camshaft is not kept level, the portion of the cylinder head which receives the shaft thrust may crack or be damaged. To avoid this, the following steps should be carried out.

HINT:

When performing this procedure to adjust the valve clearance, it is not necessary to apply seal packing to the No. 5 bearing cap and camshaft housing plug.


(a) Check that the timing mark of the crankshaft timing pulley is in the position shown in the illustration, and that the piston is below the TDC of compression.

NOTICE:

Having the crankshaft pulley at a wrong angle can cause the piston head and valve head to come into contact with each other when removing the camshaft. Always set the crankshaft pulley at the correct angle as shown in the illustration.

(b) Apply a light coat of engine oil to the cam lobe and gear of the camshaft and also the journal of the cylinder head.


(c) Using a wrench, align the timing marks (2 dot marks each) of the camshaft drive and driven main gears, and set the No. 3 and No. 4 camshafts in place.

(d) Install the bearing cap.


(1) Apply seal packing to the camshaft housing plug groove.

HINT:

Remove any old packing (FIPG) material before applying new seal packing.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent


(2) Install the camshaft housing plug and oil control valve filter to the cylinder head as shown in the illustration.

NOTICE:

  • Be careful of the installation direction.
  • Remove any oil from the contact surface.


(3) Apply seal packing to the No. 1 bearing cap as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

Standard seal diameter:

1.5 to 2.0 mm (0.0591 to 0.0787 in.)

NOTICE:

  • Do not apply seal packing to the front bearing cap grooves.
  • Install the No. 1 bearing cap and housing plug within 3 minutes.


(4) Install 4 new seal washers to the bearing cap bolts (A and B).

(5) Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts (C to E).

NOTICE:

Do not apply engine oil to the bearing cap bolts (A and B).


(6) Temporarily install the oil feed pipe and bearing caps with the 22 bolts, as shown in the illustration.

Bolt Length:

Item

Length

Bolt A with seal washer

94 mm (3.70 in.)

Bolt B with seal washer

72 mm (2.84 in.)

Bolt C

25 mm (0.984 in.)

Bolt D

55 mm (2.17 in.)

Bolt E

40 mm (1.58 in.)


(7) Push in the camshaft setting oil seal.


(8) Uniformly tighten the 22 bearing cap bolts in several steps, in the sequence shown in the illustration.

  • for bolt 21, 22

Torque: 7.5 N·m (76 kgf·cm, 66 in·lbf)

  • for other bolt

Torque: 16 N·m (163 kgf·cm, 12 ft·lbf)


(e) Bring the service bolt installed in the driven sub-gear upward by turning the hexagonal portion of the camshaft with a wrench.

(f) Remove the service bolt.

5. INSTALL REAR TIMING BELT PLATE LH

(a) Install the No. 1 timing belt plate and No. 2 timing plate with the 3 bolts.

Torque: 7.5 N·m (76 kgf·cm, 66 in·lbf)

6. INSTALL CAMSHAFT TIMING PULLEY SUB-ASSEMBLY LH


(a) Align the camshaft timing tube knock pin with the knock pin groove of the timing pulley.

(b) Temporarily install the 4 bolts of the camshaft timing pulley.

(c) Hold the hexagonal portion of the camshaft with a wrench.

(d) Using a 5 mm hexagon wrench, tighten the 4 bolts.

Torque: 8.1 N·m (83 kgf·cm, 72 in·lbf)

7. INSTALL CAMSHAFT POSITION SENSOR ASSEMBLY 2UZ-FE ENGINE CONTROL: CAMSHAFT POSITION SENSOR: INSTALLATION (2008 Sequoia)+

8. INSTALL CAMSHAFT (for Bank 2)

NOTICE:

As the thrust clearance of the camshaft is small, the camshaft must be kept level while it is being installed. If the camshaft is not kept level, the portion of the cylinder head which receives the shaft thrust may crack or be damaged. To avoid this, the following steps should be carried out.

HINT:

When performing this procedure to adjust the valve clearance, it is not necessary to apply seal packing to the No. 5 bearing cap and camshaft housing plug.


(a) Check that the timing mark of the crankshaft timing pulley is in the position shown in the illustration, and that the piston is below the TDC of compression.

NOTICE:

Having the crankshaft pulley at a wrong angle can cause the piston head and valve head to come into contact with each other when removing the camshaft. Always set the crankshaft pulley at the correct angle as shown in the illustration.

(b) Apply a light coat of engine oil to the cam lobe and gear of the camshaft and also the journal of the cylinder head.


(c) Using a wrench, align the timing marks (1 dot marks each) of the camshaft drive and driven main gears, and set the No. 1 and No. 2 camshafts in place.

(d) Install the bearing cap.


(1) Apply seal packing to the camshaft housing plug groove.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

HINT:

Remove any old packing (FIPG) material before applying new seal packing.


(2) Install the camshaft housing plug and oil control valve filter to the cylinder head as shown in the illustration.

NOTICE:

  • Be careful of the installation direction.
  • Remove any oil from the contact surface.


(3) Apply seal packing to the No. 1 bearing cap as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

Standard seal diameter:

1.5 to 2.0 mm (0.0591 to 0.0787 in.)

NOTICE:

  • Do not apply seal packing to the front bearing cap grooves.
  • Install the No. 1 bearing cap and housing plug within 3 minutes.


(4) Install 4 new seal washers to the bearing cap bolts (A and B).

(5) Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts (C to E).

NOTICE:

Do not apply engine oil to the bearing cap bolts (A and B).


(6) Temporarily install the oil feed pipe and bearing caps with the 22 bolts, as shown in the illustration.

Bolt Length:

Item

Length

Bolt A with seal washer

94 mm (3.70 in.)

Bolt B with seal washer

72 mm (2.84 in.)

Bolt C

25 mm (0.984 in.)

Bolt D

55 mm (2.17 in.)

Bolt E

40 mm (1.58 in.)


(7) Push in the camshaft setting oil seal.


(8) Uniformly tighten the 22 bearing cap bolts in several steps, in the sequence shown in the illustration.

  • for bolt 21, 22

Torque: 7.5 N·m (76 kgf·cm, 66 in·lbf)

  • for other bolt

Torque: 16 N·m (163 kgf·cm, 12 ft·lbf)


(e) Bring the service bolt installed in the driven sub-gear upward by turning the hexagonal portion of the camshaft with a wrench.

(f) Remove the service bolt.

9. INSTALL REAR TIMING BELT PLATE RH

(a) Install the No. 1 timing belt plate and No. 2 timing belt plate with the 4 bolts.

Torque: 7.5 N·m (76 kgf·cm, 66 in·lbf)

10. INSTALL CAMSHAFT TIMING PULLEY



(a) Align the camshaft timing tube knock pin with the knock pin groove of the timing pulley.

(b) Temporarily install the 4 bolts of the camshaft timing pulley.

(c) Hold the hexagonal portion of the camshaft with a wrench.

(d) Using a 5 mm hexagon wrench, tighten the 4 bolts.

Torque: 8.1 N·m (83 kgf·cm, 72 ft·lbf)

11. INSTALL TIMING BELT 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

12. CHECK NO. 1 CYLINDER TO TDC/COMPRESSION 2UZ-FE ENGINE MECHANICAL: VALVE CLEARANCE: ADJUSTMENT (2008 Sequoia)+

13. INSPECT VALVE CLEARANCE 2UZ-FE ENGINE MECHANICAL: VALVE CLEARANCE: ADJUSTMENT (2008 Sequoia)+

14. ADJUST VALVE CLEARANCE 2UZ-FE ENGINE MECHANICAL: VALVE CLEARANCE: ADJUSTMENT (2008 Sequoia)+

15. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH


(a) Apply seal packing to the semicircular plug grooves.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

(b) Install the 2 semicircular plugs to the cylinder heads.

(c) Install the gasket to the cylinder head cover.


(d) Apply seal packing to the cylinder head as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

NOTICE:

  • Remove any oil from the contact surface.
  • Install the cylinder head cover within 3 minutes after applying seal packing.


(e) Install the cylinder head cover with the 9 bolts. Uniformly tighten the bolts in several steps.

Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)

16. INSTALL VENTILATION HOSE

(a) Install the ventilation hose.

17. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


(a) Apply seal packing to the semicircular plug grooves.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

(b) Install the 2 semicircular plugs to the cylinder heads.

(c) Install the gasket to the cylinder head cover.


(d) Apply seal packing to the cylinder head as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

NOTICE:

  • Remove any oil from the contact surface.
  • Install the cylinder head cover within 3 minutes after applying seal packing.


(e) Install the cylinder head cover with the 9 bolts. Uniformly tighten the bolts in several steps.

Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)

18. INSTALL SPARK PLUG 2UZ-FE ENGINE CONTROL: IGNITION COIL AND SPARK PLUG: INSTALLATION (2008 Sequoia)+

19. INSTALL IGNITION COIL ASSEMBLY 2UZ-FE ENGINE CONTROL: IGNITION COIL AND SPARK PLUG: INSTALLATION (2008 Sequoia)+

20. INSTALL NO. 1 WATER PIPE SUB-ASSEMBLY 2UZ-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALLATION (2008 Sequoia)+

21. CONNECT INLET HEATER WATER HOSE D

(a) Connect the inlet heater water hose D to the No. 3 water by-pass pipe.

22. CONNECT NO. 5 WATER BY-PASS HOSE

(a) Connect the No. 5 water by-pass hose to the No. 3 water by-pass pipe.

23. INSTALL ENGINE WIRE



(a) Connect the 3 connectors to the engine room junction block.

(b) Install the engine wire with the nut.

Torque: 10 N·m (102 kgf·cm, 7 ft·lbf)

(c) Connect the 4 air injection control driver connectors.

(d) Install the ground wire with the bolt.

Torque: 8.0 N·m (82 kgf·cm, 71 in·lbf)

(e) Connect the positive (+) battery terminal and install the engine wire with the nut.

Torque: 13 N·m (133 kgf·cm, 10 ft·lbf)

24. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1)

(a) Install the air switching valve assembly 2UZ-FE EMISSION CONTROL: AIR SWITCHING VALVE: INSTALLATION (2008 Sequoia) .

25. INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY 2UZ-FE FUEL: FUEL PRESSURE PULSATION DAMPER: INSTALLATION (2008 Sequoia)+

26. CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY 2UZ-FE FUEL: FUEL INJECTOR: INSTALLATION (2008 Sequoia)+

27. CONNECT NO. 2 FUEL PIPE SUB-ASSEMBLY 2UZ-FE FUEL: FUEL INJECTOR: INSTALLATION (2008 Sequoia)+

28. INSTALL FUEL PIPE CLAMP 2UZ-FE FUEL: FUEL INJECTOR: INSTALLATION (2008 Sequoia)+

29. INSTALL VACUUM HOSE ASSEMBLY 2UZ-FE INTAKE / EXHAUST: INTAKE MANIFOLD: INSTALLATION (2008 Sequoia)+

30. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

31. INSTALL NO. 1 TIMING BELT COVER 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

32. INSTALL CRANKSHAFT DAMPER SUB-ASSEMBLY 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

33. INSTALL FAN BRACKET SUB-ASSEMBLY 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

34. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

35. INSTALL NO. 2 TIMING BELT COVER SUB-ASSEMBLY 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

36. INSTALL NO. 3 TIMING BELT COVER SUB-ASSEMBLY LH 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

37. INSTALL NO. 2 TIMING CHAIN OR BELT COVER 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

38. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

39. INSTALL OIL COOLER PIPE 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

40. INSTALL COOLER COMPRESSOR ASSEMBLY 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

41. INSTALL GENERATOR ASSEMBLY 2UZ-FE BATTERY / CHARGING: GENERATOR: INSTALLATION (2008 Sequoia)+

42. INSTALL VANE PUMP ASSEMBLY 2UZ-FE ENGINE MECHANICAL: TIMING BELT: INSTALLATION (2008 Sequoia)+

43. INSTALL FAN SHROUD (w/ Trailer Towing System) A750F AUTOMATIC TRANSMISSION / TRANSAXLE: AIR COOLED OIL COOLER: INSTALLATION (2008 Sequoia)+

44. INSTALL FAN SHROUD (w/o Trailer Towing System) 2UZ-FE COOLING: RADIATOR: INSTALLATION (2008 Sequoia)+

45. CONNECT OUTLET RADIATOR HOSE 2UZ-FE COOLING: RADIATOR: INSTALLATION (2008 Sequoia)+

46. CONNECT INLET RADIATOR HOSE 2UZ-FE COOLING: RADIATOR: INSTALLATION (2008 Sequoia)+

47. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE 2UZ-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALLATION (2008 Sequoia)+

48. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY 2UZ-FE ENGINE CONTROL: THROTTLE BODY: INSTALLATION (2008 Sequoia)+

49. ADD ENGINE OIL 2UZ-FE LUBRICATION: OIL AND OIL FILTER: REPLACEMENT (2008 Sequoia)+

50. ADD ENGINE COOLANT 2UZ-FE COOLING: COOLANT: REPLACEMENT (2008 Sequoia)+

51. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque: 5.4 N·m (55 kgf·cm, 48 in·lbf)

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected INTRODUCTION: REPAIR INSTRUCTION: INITIALIZATION (2008 Sequoia) .

52. INSPECT FOR OIL LEAK

53. INSPECT FOR COOLANT LEAK 2UZ-FE COOLING: COOLING SYSTEM: ON-VEHICLE INSPECTION (2008 Sequoia)+

54. INSPECT FOR FUEL LEAK 2UZ-FE FUEL: FUEL SYSTEM: ON-VEHICLE INSPECTION (2008 Sequoia)+

55. CHECK ENGINE OIL LEVEL 2UZ-FE LUBRICATION: LUBRICATION SYSTEM: ON-VEHICLE INSPECTION (2008 Sequoia)+

56. INSPECT IGNITION TIMING 2UZ-FE ENGINE MECHANICAL: ENGINE: ON-VEHICLE INSPECTION (2008 Sequoia)+

57. INSPECT ENGINE IDLE SPEED 2UZ-FE ENGINE MECHANICAL: ENGINE: ON-VEHICLE INSPECTION (2008 Sequoia)+

58. INSTALL NO. 1 ENGINE UNDER COVER 2UZ-FE LUBRICATION: OIL AND OIL FILTER: REPLACEMENT (2008 Sequoia)+